Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.
Appealing SEO Title
Cabinets Set Level, Secured Right, and Built to Last
Standard base cabinets stand 34 1/2 inches tall, so a finished countertop lands near 36 inches, and upper cabinets usually hang about 18 inches above that surface. Black Bird Construction LLC provides cabinet installation in Centralia, WA, for kitchens, bathrooms, laundry rooms, mudrooms, and garages, locating studs, shimming for level, scribing to walls, and adjusting every door and drawer. We install cabinets for homeowners across Lewis County, Olympia, Aberdeen, Tacoma, and surrounding Southwest Washington communities.
A Home Drawn Around the Way You Actually Live
Our crew draws on 25+ years of residential and commercial carpentry, so we recognize the uneven floors and out-of-square walls that make installations tricky. Family owned, veteran operated, and licensed, bonded, and insured, we coordinate with plumbers, electricians, and countertop fabricators to keep the project moving. Measurements are confirmed before any cabinet is fastened, and adjustments are explained clearly. Send your layout or cabinet order details through our contact page, and we will plan your installation carefully.
Explore Our Cabinet Installation Services
Kitchen Cabinet Installation
Kitchen cabinets carry heavy dishes and support expensive countertops, so precision matters. We establish level reference lines, fasten boxes securely into wall framing, join adjacent units tightly, and leave accurate openings for appliances, sinks, and range hoods throughout the room.
Bathroom Vanity Installation
Vanities must align with existing drain and supply lines while sitting perfectly level for tops and sinks. We adjust bases, cut precise plumbing openings, and fasten each unit firmly, preparing the vanity for faucet and countertop installation by the appropriate trades.
Laundry and Mudroom Cabinets
Utility spaces benefit from sturdy storage for detergents, coats, shoes, and sports gear. We install upper cabinets, tall units, and bench bases that make these busy areas more organized while withstanding the moisture and wear they experience daily.
Garage and Utility Storage
Garages quickly fill with tools, paint cans, and seasonal equipment. Wall-mounted cabinets and tall storage units get items off the floor, and we anchor them firmly into framing so they safely carry heavy loads without sagging or pulling loose.
Cabinet Replacement and Removal
Swapping old cabinets requires careful demolition to protect walls, flooring, and plumbing. We remove existing units, repair damaged drywall, address any hidden moisture issues, and prepare the space properly before new cabinets are set in their final positions.
Hardware and Adjustments
Handles, pulls, soft-close hinges, and drawer slides make a noticeable difference in daily use. We install hardware with consistent spacing using templates and fine-tune hinges and slides so every door closes quietly and every drawer runs straight and smooth.
Why Choose Us for Cabinet Installation
Secured Into Framing
Loaded cabinets can weigh hundreds of pounds. Fastening into studs rather than relying on drywall anchors keeps upper units safely on the wall, protecting your dishes, your family, and your investment from failures that poor mounting can eventually cause.
Level on Uneven Floors
Few houses have perfectly flat floors or plumb walls. Patient shimming and scribing compensate for those imperfections, giving you a straight run of cabinets, a stable surface for countertops, and doors that stay aligned instead of drifting out of position.
Doors That Line Up
Uneven gaps and crooked doors are the first things people notice. Careful hinge adjustment produces consistent reveals across the entire installation, so your new cabinetry looks polished and professional instead of looking slightly off from every angle in the room.
Countertop Fabricators Coordinated
Stone and quartz countertops require a solid, perfectly level base and precise templates. Coordinating installation timing with fabricators prevents costly remeasurements, reduces waiting between steps, and helps your kitchen or bathroom return to normal use sooner than expected.
Careful Handling
New cabinets are easy to scratch, dent, or chip during delivery and installation. Protective handling, organized staging, and prompt inspection of each box help catch shipping damage early, so replacement parts can be ordered before they delay your project.
Clean, Finished Edges
Filler strips, end panels, toe kicks, and trim complete the installation professionally. Taking time with these details hides gaps against walls and floors, giving your cabinetry a custom, built-in appearance that elevates the entire room around it for years to come.
Enjoy Cabinets That Open Smoothly and Stay That Way
Great cabinets can look disappointing when they are installed in a hurry, and modest cabinets can look impressive when they are set with patience. Black Bird Construction LLC installs cabinetry in Centralia, WA, with level bases, secure fastening, and careful adjustments that keep doors and drawers working properly year after year. Whether your cabinets are already ordered or you are still comparing styles, a quick review of your layout and measurements helps prevent problems before installation day. Visit our contact page to request a consultation, and we will talk through measurements, timing, and coordination with the other trades on your project.
FAQ's
How are cabinets installed on uneven floors?
Installers find the highest point of the floor, set a level reference line from there, and shim lower cabinets up to match. Toe kicks and trim then hide gaps, leaving a level surface ready for countertops without visible unevenness.
Should upper or lower cabinets be installed first?
Many installers hang upper cabinets first, since they can work comfortably without reaching over base units. Others start with base cabinets to use them as a reference. Either method works when layout lines are accurate and consistently followed.
Why are cabinet doors misaligned after installation?
Doors often drift when cabinets were fastened out of level, when hinges need adjustment, or when wood reacts to humidity changes. Most European-style hinges allow simple screw adjustments that bring doors back into alignment within just a few minutes of work.
Can new cabinets be installed on walls that are not square?
Yes. Installers scribe filler strips and end panels to follow irregular walls, and shims keep boxes plumb despite bows or bumps. Black Bird Construction LLC regularly handles these conditions in older homes throughout Centralia, WA, and nearby communities.
What is the difference between a drywall anchor and a stud?
A stud is a vertical framing member that provides solid support, while a drywall anchor only grips gypsum board. Heavy cabinets should always be fastened into studs or added blocking, since anchors alone can pull loose under load.
Can new cabinets be installed without replacing countertops?
It is possible but tricky, because existing countertops must be removed carefully and may crack during the process. Stone and laminate tops rarely match new cabinet dimensions exactly, so replacing both together is often the more practical choice.
How long does cabinet installation take?
An average kitchen installation takes roughly 2 to 5 days, depending on size, layout complexity, and wall conditions. Black Bird Construction LLC schedules installations in Centralia, WA, around deliveries and countertop templating to keep your project on track.
What should I do before cabinet installers arrive?
Clear the room, empty old cabinets, and make sure the delivered boxes can be staged nearby without blocking walkways. Confirming appliance models and sizes beforehand also prevents surprises when openings are laid out on installation day in your home.

